1Cold hand over 50Km3 Chilled Warehouse & Distribution project on time & snag free.
- Project Duration: 22 weeks
- Completion: August 2016
- Volume: 50,000m3
- Operational Temp: 2°C

3D Concept

Aerial Shot Actual

Aerial Shot Actual

Steelwork

Steelwork

Concrete Floor

Concrete Floor

Panel Work

Panel Work

Panel Work

Internal

Internal

Internal

Refrigeration

Rapid Rise Door

Rapid Rise Door

Racking

LED Lighting

Racking

External

External

External

External

External

External